Our IP is PLAY.POKEMONSERVER.NET
You Unova builders are getting things done so quickly! Good job (and thank you) to all you Unova builders!
(Editing this post whenever I finish something)Mistralton gym exterior doneWeather institute exterior doneStatue when you exit Driftveil Drawbridge on the Driftveil side is completed, along with the booth.Road at the south point of Driftveil where the car tunnel is seems to be done.Booth to get on Driftveil Drawbridge is also done on route 5Route 5 RV is also done.Lentimas town houses have been made.Strange house exterior done.
Marvelous Bridge is done. Water will come with terraforming.